Search

English中文版
  • Home
  • About Us
    • Profile
    • History
    • Mission
    • Affiliations
    • Team of Experts
  • News
  • Experience
    • Engineering
    • Consulting
    • Investment
  • Services
    • Engineering
    • Consulting
    • Investment
    • Cleantech
    • Export
  • Our Clients
  • Careers
  • Contact Us

Consulting

  • Investigation: Children Exposure to Particulate Matter Pollutants

    Investigation: Children Exposure to Particulate Matter Pollutants   Location: Kingsville, TX, and Los Angeles, CA, USA   Period: 2007 - 2010   Project Description: The project consisted of providing consulting services specialized in Air and Noise Monitoring.   1. Performed PM2.5, Black Carbon, CO2, and Ultrafine Particles monitoring and measurement   2. Measured air quality inside school buses and classrooms under different ventilation scenarios   3. Investigation on pollutants transport between ambient environment and enclosure environment     Please proceed to Air Quality Monitoring for more information, or enquire with us through any of our offices listed in the Contact Us section.
    MORE>>
  • ADB PPTA Jilin Urban Environmental Improvement Project

      ADB PPTA Jilin Urban Environmental Improvement Project     EASEN signed for the ADB PPTA Jilin Urban Environmental Improvement Project to assist in the  improvement of water supply, wastewater management, solid waste management and efficient central heating in the cities of Changchun and Yanji. The project enhanced the urban environment and improved public health and quality of life for urban residents in the aforementioned cities, by increasing wastewater coverage, enhancing solid waste management, improving the supply of potable water, and reducing air pollution.     Project components included:   Changchun city water supply, wastewater treatment and solid waste management Yanji city water supply and wastewater treatment Yanji city central heating system     The project also provided for institutional capacity building for effective management including:   Providing training to strengthen organizational structure and staff resources to implement, operate and maintain the project components Strengthening management practices in human resources, finance, and corporate planning Providing for managers and staff responsible for service delivery to ensure efficient implementation and sustainability of project benefits     EASEN provided the following services:   Preparation of a detailed work plan and formulation of a project design and monitoring framework that captures the multi-sector nature of an urban development investment project Review and assess all relevant government urban and sector development plans, environmental policies, and the Feasibility Study Reports (FSRs) of all subprojects Oversee the detailed peer review of FSRs Prepare the project implementation schedule and detailed implementation arrangements Ensure that cross-cutting concerns (resettlement, environment, poverty, social, gender, private sector development, and anti-corruption) are rigorously addressed at sub-project and project levels Liaise and coordinate with the executing agency, steering committee, and ADB on project-related matters Ensure the timely preparation of the inception, interim, draft final and final Project Preparation Technical Assistance (PPTA) reports and their submission to the Government and ADB Provide guidance and support as required to all PPTA team members in all aspects of the study Undertake project management activities, including preparation of periodic progress reports, budget management and reporting, control of PPTA funds, and liaison with ADB personnel Analyze the current situation of water supply and wastewater management including its implications and impact on Changchun’s water resources and the government’s proposals for water supply and wastewater management Conduct a peer review of domestic FSRs dealing with wastewater management and water supply Review subproject costs considering costing approach, phasing of the project costs and where applicable unit costs and related physical quantities Review and evaluate projections of water sales and production, and wastewater generation (volume and strength) Comment on the reasonableness and suitability of projections for planning purposes and develop alternative projections as appropriate for the PPTA analysis Consider industrial effluents and pretreatment requirements in assessing wastewater strength     This PPTA started in November 2006 and was finished in May 2007.  
    MORE>>
  • World Bank Loan 4597-CHA: Huaihe River Pollution Control Project (HRPCP)

    World Bank Loan 4597-CHA: Huaihe River Pollution Control Project (HRPCP)     EASEN signed for the World Bank Financed Anhui Huai River Basin Pollution Control Project (HRPCP) to provide consulting services for the overall project implementation. The project was designed to upgrade water quality in Huai River Basin in Anhui Province. The project supported policy and institutional reforms in the establishment of well performing and sustainable wastewater treatment agencies as well as the physical works for the wastewater collection system and treatment plants. The project involved the construction and development of wastewater facilities in the cities of Bengbu, Huainan and Lu’an in the Huai River Basin of Anhui Province, aiming to improve the surface water environment in the Huai River Basin and reduce the pollution discharged to the river through improved municipal wastewater management.   EASEN provided the following services:   Project Technical Strengthening Assistance to the Anhui Project Management Office (APMO) and the PIUs in conducting review of project design and design variation Technical assistance for resettlement and environmental monitoring during project implementation Ensure development in compliance with international practices and in accordance with the World Bank requirements Procurement Strengthening to ensure the procurement practices are in accordance with WB guidelines and assist to speed up the progress of the procurement overall Review the International Competitive Bidding (ICB) and National Competitive Bidding (NCB) documents and their Bidder Evaluation Reports (BERs) Track the procurement process for each package in the project Work as tender agency on NCB under the APMO’s assistance Project Implementation Management Strengthening Supervision and advice to project progress, contract implementation and disbursement to ensure these are in line with WB requirements Technical advice to the construction supervision companies employed by the PIU in order to ensure the project implemented in line with the construction schedule, quality designated, and under budget Training: On-the-job training to staff of APMO and PIUs and vocational guidance to deal with disputes on project management and supervision               This project started in January 2006 and was completed in June 2008.    
    MORE>>
  • Petroleum Contamination Site Remediation for Charlotte Hospital

    Petroleum Contamination Site Remediation for Charlotte Hospital in North Carolina, USA     Location: Charlotte, North Carolina, USA   Period: 2006   Project Type: Design and Implementation   Project Description: EASEN's environmental remediation experts provided a site investigation and emergency response for a gas spill at the local hospital.   Our remediation engineers conducted site sampling and analysis, implemented excavation with off-site treatment for the contaminated soil, and established an Environmental Management System.     Please proceed to Environmental Remediation Services for more information, or enquire with us through any of our offices listed in the Contact Us section.
    MORE>>
  • ADB Loan 1996-PRC Wuhan Wastewater Management Project

    ADB Loan 1996-PRC Wuhan Wastewater Management Project       EASEN was contracted for the Asian Development Bank (ADB) Wuhan Wastewater Management Project, Wuhan, China The project lasted between 2005 to 2008.     In partnership with CDM International Inc (US) EASEN acted as:   Assistant team leader Wastewater specialist Financial specialist Contract management specialist for TA construction management   The assignment included:   Overall project management Preparation of bidding documents Review of pre-qualification evaluation reports Bidding process management in line with ADB procurement policies and procedures Wastewater process review and supervision  Construction supervision Financial guidance and planning  
    MORE>>
  • « first
  • ‹ previous
  • …
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • next ›
  • last »

Experience

  • Engineering
  • Consulting
  • Investment
Copyright 2012 © Easen. All rights reserved. | Site by:Webfoss
Logout