Search

English中文版
  • Home
  • About Us
    • Profile
    • History
    • Mission
    • Affiliations
    • Team of Experts
  • News
  • Experience
    • Engineering
    • Consulting
    • Investment
  • Services
    • Engineering
    • Consulting
    • Investment
    • Cleantech
    • Export
  • Our Clients
  • Careers
  • Contact Us

Engineering

  • Wastewater Treatment System for Zibo Kohler Co., Ltd.

    Location: Zibo City, Shandong Province, China   Year: November 2010 - 2012   Capacity: 500 m3/d   Project Description: Wastewater treatment system for Zibo Kohler Co., Ltd.   Under this contract, EASEN was in charge of the entire project implementation including design, procurement, installation, construction, and commissioning of the wastewater treatment system for Kohler’s ceramics manufacturing facility in Zibo.       Please proceed to Water and Wastewater Treatment for more information, or enquire with us through any of our offices listed in the Contact Us section.
    MORE>>
  • Sewage & Water Supply System for Energy Resources/Ukhaa Khudag Water Supply LLC

      Location: Mongolia   Year: September 2010   Capacity: 100 m3/d   Project Description: Sewage treatment facility for Ukhaa Khudag Water Supply LLC in Mongolia.   EASEN was responsible for the design and installation of all equipment included in the integrated sewage treatment facility (STF). On-site commissioning completed.       Please proceed to Water and Wastewater Treatment for more information, or enquire with us through any of our offices listed in the Contact Us section.
    MORE>>
  • Water Treatment System Jiangsu New Chunxing Resource Recycling Co., Ltd.

    Location: Pizhou City, Jiangsu Province, China   Year: 2010 - 2011   Capacity: 450 m3/d   Process: Biological Contact Oxidation + Sedimentation   Project Description: Treatment system which collected and treated all wastewater from the plant and storm water collected in the surroundings. Main pollutants were CODcr, BOD5, SS, NH3-N and TP.       Please proceed to Water and Wastewater Treatment for more information, or enquire with us through any of our offices listed in the Contact Us section.
    MORE>>
  • Leachate Treatment System for Huangshi C&G Environmental Protection Group

    Location: Huangshi City, Hubei Province, China   Year: February 2010 - 2011   Capacity: 240 m3/day   Project Description: This is a multiple phase project in which EASEN provided Engineering, Procurement and Commissioning (EPC) services for the construction and operation of the leachate treatment system for a municipal solid waste landfill.   This contract, signed between EASEN and the Huangshi Solid Waste Landfill, involved the recovery of the methane produced in the landfill. Influent COD: 50,000 mg/L, Discharge Limits: COD: 100 mg/L.  
    MORE>>
  • Leachate Treatment System for Huzhou Mizuda Group

      Location: Huzhou City, Zhejiang Province, China   Year: November 2009 - 2010   Capacity: 150 m3/day   Project Description: This is a multiple phase project in which EASEN provided technical advisory and consultancy services for the construction and operation of the leachate treatment system for a municipal solid waste landfill.   This contract, signed between EASEN and the Huzhou South Tai Lake Solid Waste Landfill, involved the recovery of 120 KW/day of methane produced in the landfill.      
    MORE>>
  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • next ›
  • last »

Experience

  • Engineering
  • Consulting
  • Investment
Copyright 2012 © Easen. All rights reserved. | Site by:Webfoss
Logout